Environmental Impact Assessment for Dong Nai 2 Hydropower station project (80 MW)

without comments

Client: Trungnam Group

Type of work:

Dong Nai 2 hydropower is the 1st hydropower station invested and built by Buy Generic Drugs Without Prescription a private company in Vietnam. In this project GFD provide consulting service cialis cialis da 5 mg 40 mg dose for Environmental Impact Assessment that is needed for Feasibility study and preliminary design.  The service include: assessment of biological impact, assessment of Social impact, assessment of Environment impact, design environmental management plan, preparation of EIA report

Written by admin

September 27th, 2008 at 11:59 am

Development of GIS-based Rural Water Management System

without comments

Client: VietGIS

Type of work:

Provide review and outline of integrated rural water management system. Design conceptual frame work for gis-based water management system. Simulation cost Buy Drugs cialis of water supply / demand in different low cost cialis scenario of hydrology, land use system.

Written by admin

September 27th, 2008 at 11:59 am

Posted in Mapping, Water resources

Tagged with ,

Construction of Ngoi Duong small hydro-power plant in Lao Cai city - technical and construction design stage

without comments

Client: Ngoi Duong small hydro-power plant in Lao Cai city

Type of work

Provide consulting service for project technical and construction design. Site visits, design how to get cialis of project layout, headwork and pressure tank. Making arrangement for design staff to complete the cialis daily use review buy rx drugs without prescription project document.

Written by admin

September 27th, 2008 at 11:56 am

Posted in Energy, Water resources