GreenField consulting & development

News, publication and blog from GreenField’s team

Archive for the ‘project’ Category

Integrated Rural Development in Northern Uplands Provinces, Vietnam.

without comments

Client:  Viettan consulting Ltd.

Type of work

Provide institutional and social research, include: i) poverty reduction, targeting especially the poorest people including those from the ethnic minority groups buy prescription drugs without a prescription in the most remote areas taking fully into account the possible higher costs involved when to take cialis and related benefits; ii) targeting financially viable and environmentally sustainable activities for community development; iii) training and capacity building requirements buy cialis online usa in order to empower local institutions and rural people through a participatory approach

Written by admin

September 27th, 2008 at 11:56 am

Posted in Rural development

Ngoi Duong small hydro-power plant in Lao Cai city - Feasibility study stage

without comments

Client: Lao Cai Mineral company (LAMICO)

Type of work

Provide consulting service buy cheap prescription drugs without prescription discount cialis for project feasibility cialis soft tabs vs cialis study. Arrangement for field survey and data collection for setting up the project feasibility study. Responsible for general project report writing. Feasibility study was completed and had been approved by local Authority and EVN.

Written by admin

September 27th, 2008 at 11:56 am

Posted in Energy

Construction of Ngoi Duong small hydro-power plant in Lao Cai city - technical and construction design stage

without comments

Client: Ngoi Duong small hydro-power plant in Lao Cai city

Type of work

Provide consulting service for project technical and construction design. Site visits, design how to get cialis of project layout, headwork and pressure tank. Making arrangement for design staff to complete the cialis daily use review buy rx drugs without prescription project document.

Written by admin

September 27th, 2008 at 11:56 am

Posted in Energy, Water resources

Strengthening the management capacity and raising awareness for biodiversity conservation at Dakrong Nature Reserve, Quang Tri province

without comments

Client: SNV

Type of work

i) Providing usa cialis href=”http://www.score-louisville.org/component/page,shop.product_details/category_id,6/flypage,flypage.tpl/product_id,59/option,com_virtuemart/Itemid,6/”>how cialis works consultant in Land Use Planning  -LUP and Forest Land Allocation -FLA activities at the  41 communes  in buy drugs the buffer zones of Cat Tien National Park and Chu Mom Ray Natural Reserve/ Central High Land.  (ii) Analyzing and assessing the commune action plans in the project areas/ focus on new sustainable farming systems and agriculture/ forestry extension activities

Written by admin

September 27th, 2008 at 11:55 am

Forest Protection and Rural Development Project (FPRDP).

without comments

Client: WB

Type of work

The service include:  (i) Providing consultant in Land Use Planning & Forest Land Allocation activities at the  41 communes  in the buffer zones of Cat Tien National Park and Chu Mom Ray Natural Reserve/ Central High Land.  (ii) Analyzing and assessing the commune online drugs without prescription action plans in the project areas/ focus on new sustainable farming systems and agriculture/ forestry cialis effectiveness price cialis extension activities

Project: Land capability mapping for World Bank afforestation project at 5 provinces in the middle area of Vietnam

Written by admin

September 27th, 2008 at 11:55 am

Posted in Rural development

Land capability mapping for World Bank afforestation project at 5 provinces in the middle area of Vietnam

without comments

Client: WB

Type of work:

The service provided include: i) establish GIS database for all provinces including soil map, slope, land cover, social-economic factors; ii) land capability mapping for 5 provinces using land evaluation and multi-criteria cialis news analysis method; iii) produce 200 maps for all project areas including: provincial land use planning map and data, district maps of land capability and tree-site matching, and detail cialis buy prescription drugs without prescription commercial implementation maps for every communes in the project areas.

Written by admin

September 27th, 2008 at 11:54 am

New technology in forest surveying and mapping

without comments

Client:VietGIS

Type of work:

VietGIS is a leading company in Geographic Information System (GIS) in Vietnam and South-East Asia. The purpose of this training course is to provide VietGIS with updated technology and trend in forestry survey and mapping, so they can be better adapted and build software / solution for forestry sector.

· Overview of forestry surveying business

· Introduction of the new VN2000 cialis for daily use projection system and how to change from the old HN72 system.

· cialis vs Use of GPS in modern survey

· buy drugs online Mobile mapping in real time environment

· Geo-statistic in forestry

· Opportunity and challenges for GIS application in Forestry and Rural Development sector

Written by admin

September 27th, 2008 at 11:54 am

GIS system for Dong Nai 2 Hydropower station project (80 MW)

without comments

buy prescription drugs online Georgia; color: #663300;”>Provide based map and how to get cialis without prescription GIS system for hydropower plant operational design and construction: topographic cialis tadalafil tablets map 1:2000, road network, site 3D model, integrated CAD system.

Written by admin

September 27th, 2008 at 11:53 am

Posted in Energy