Archive for the ‘Energy’ Category
Environmental Impact Assessment for Dong Nai 2 Hydropower station project (80 MW)
Client: Trungnam Group
Type of work:
Dong Nai 2 hydropower is the 1st hydropower station invested and built by Buy Generic Drugs Without Prescription a private company in Vietnam. In this project GFD provide consulting service cialis cialis da 5 mg 40 mg dose for Environmental Impact Assessment that is needed for Feasibility study and preliminary design. The service include: assessment of biological impact, assessment of Social impact, assessment of Environment impact, design environmental management plan, preparation of EIA report
Strengthening Institutional Capacity of Local Stakeholders for Implementation of Son La Livelihood and Resettlement Plan. TA-4690 (VIE)
Client: ADB
Type of work:
The service include (i) assessing the master plan of resettlement sites in Son La, Lai Chau and Dien Bien /focus to Land use plan at resettlement sites (i) assessing training needs of stakeholders on Land use plan issue (iii) Preparing training modules on Micro-land cialis soft online use at household level and implementing TOT training of Buy Generic Drugs this topic for agriculture extension staffs in 3 provinces of project areas prescription cialis
Ngoi Duong small hydro-power plant in Lao Cai city - Feasibility study stage
Client: Lao Cai Mineral company (LAMICO)
Type of work
Provide consulting service buy cheap prescription drugs without prescription discount cialis for project feasibility cialis soft tabs vs cialis study. Arrangement for field survey and data collection for setting up the project feasibility study. Responsible for general project report writing. Feasibility study was completed and had been approved by local Authority and EVN.
Construction of Ngoi Duong small hydro-power plant in Lao Cai city - technical and construction design stage
Client: Ngoi Duong small hydro-power plant in Lao Cai city
Type of work
Provide consulting service for project technical and construction design. Site visits, design how to get cialis of project layout, headwork and pressure tank. Making arrangement for design staff to complete the cialis daily use review buy rx drugs without prescription project document.
GIS system for Dong Nai 2 Hydropower station project (80 MW)
buy prescription drugs online Georgia; color: #663300;”>Provide based map and how to get cialis without prescription GIS system for hydropower plant operational design and construction: topographic cialis tadalafil tablets map 1:2000, road network, site 3D model, integrated CAD system.